地埋警示樁使用期間不需要費心維護,還有一個比較重要的方面就是它具有很好的防盜性,它是一次性成型,更好的保證了它在使用期間能夠更好的發(fā)揮作用。那么地埋警示樁怎么埋?
There is no need to worry about maintenance during the use of the buried warning pile. Another important aspect is that it has good anti-theft property. It is formed at one time, which better ensures that it can play a better role during the use. So how to bury the warning pile?
1.模具制作。 示警樁模具采用圓鋼加工制作,分左右兩半,并且上面焊有緊固螺栓,以防止其 振搗張開,影響其尺寸。
1. Mold making. The warning pile mold is made of round steel, divided into left and right halves, and is welded with fastening bolts to prevent its vibration from opening and affecting its size.
2.示警樁預(yù)制 。預(yù)制采用集中預(yù)制,按設(shè)計要求,先澆筑保護層再放入預(yù)制好的配筋,再采用分層澆筑,用振搗器搗密實后澆筑第二層,待澆筑后達到凝固強度后,打開模具,將其表面纏覆蓋薄膜進行養(yǎng)生。
2. Warning pile prefabrication. The prefabrication adopts centralized prefabrication. According to the design requirements, the protective layer is poured first, then the prefabricated reinforcement is placed, and then the layered pouring is adopted. The second layer is poured after being compacted with a vibrator. After the pouring reaches the solidification strength, the mold is opened, and its surface is wrapped with a film for curing.
3.示警樁基礎(chǔ)開挖 。示警樁施工工具流動性大,零碎的特點,基礎(chǔ)采用人工開挖,并將底部整壓實。
3. Warning pile foundation excavation. Warning pile construction tools have the characteristics of large fluidity and fragmentation. The foundation is excavated manually and the bottom is compacted.
4.噴涂發(fā)光漆 。嚴格按圖紙要求的顏色、間距涂刷發(fā)光漆。
4. Spray luminous paint. Apply luminous paint in strict accordance with the color and spacing required by the drawing.
此外開工前要行場地清理,包括開挖區(qū)的垃圾、雜草、不可利用的表土及其障礙物,應(yīng)對測量控制點及放線位置進行校核。開挖邊線應(yīng)有足夠數(shù)量的地埋警示樁。并要注意防止移位、損壞,施工方需邀請村委和群眾代表一同參與放線工作。避免發(fā)生不必要的矛盾,保證工程開工順利進行。
In addition, the site shall be cleared before construction, including garbage, weeds, unusable topsoil and obstacles in the excavation area. The measurement control points and setting out positions shall be checked. The excavation sideline shall have a sufficient number of buried warning piles. Attention should also be paid to prevent displacement and damage. The construction party should invite the village committee and mass representatives to participate in the setting out work. Avoid unnecessary contradictions and ensure the smooth commencement of the project.
開挖基礎(chǔ)的深度和寬度要符合按設(shè)計要求。如有異常現(xiàn)象應(yīng)及時向監(jiān)理、業(yè)主匯報,待做出處理決定后再繼續(xù)施工?;靥钔烈凑找筮M行回填,否則一律不予驗收。
The depth and width of the excavated foundation shall meet the design requirements. If there is any abnormal phenomenon, it should be reported to the supervisor and the owner in time, and the construction can be continued after the decision is made. The backfill shall be backfilled as required, otherwise it will not be accepted.
How to bury the warning pile? The above is the relevant answer to the question. If you are interested or need to buy, please follow the website http://m.tianyals.cn Contact us for advice.