電纜警示樁設(shè)置的位置和間距符合什么規(guī)定呢?這個(gè)問題是不少使用者都想明白的事情,下面就讓小編為您簡(jiǎn)單講解一番吧。
What are the requirements for the location and spacing of cable warning posts? This problem is something that many users want to understand. Let Xiaobian explain it briefly for you.
1、電纜警示樁應(yīng)安裝在管道的正上方,當(dāng)電纜警示樁用作轉(zhuǎn)角樁時(shí),應(yīng)安裝在轉(zhuǎn)角段中點(diǎn)的正上方。當(dāng)管道正上方?jīng)]有安裝條件時(shí),可設(shè)置在相對(duì)距離教近的路邊綠化帶內(nèi),并在電纜警示樁上標(biāo)明管樁適意圖。
1. The cable warning pile shall be installed directly above the pipe. When the cable warning pile is used as a corner pile, it shall be installed directly above the midpoint of the corner section. When there are no installation conditions directly above the pipeline, it can be set in the roadside green belt with a relatively close distance, and the cable warning pile shall be marked with the pipe pile intention.
2、全封閉禁入道路不得設(shè)置電纜警示樁。電纜警示樁的安裝間距宜為100m。地面平坦、視礙少、管道路由順直的情況,電纜警示樁的安裝間距可大100m。特殊地段,具體鋪設(shè)規(guī)范制度進(jìn)行管道警示樁的鋪設(shè)!
2. Cable warning posts shall not be set on totally closed roads. The installation spacing of cable warning piles should be 100m. When the ground is flat, there are few visual obstacles and the pipeline route is straight, the installation spacing of cable warning piles can be more than 100m. In special sections, lay warning piles according to specific laying specifications and systems!
3、電纜警示樁是埋設(shè)在天然氣高壓管線沿線以塑鋼、玻璃鋼、復(fù)合材質(zhì)為主,涂有黃色標(biāo)記的電纜走向警示樁,為起提示警示作用,標(biāo)有“燃?xì)夤艿?、燃?xì)怆娫?、管線樁號(hào)、管線走向、電子巡檢信息鈕”,便于巡線搶修人員迅速找準(zhǔn)管線位置,贏得搶修時(shí)機(jī)。
3. Cable warning piles are mainly plastic steel, glass fiber reinforced plastic and composite materials buried along the natural gas high-pressure pipelines, and are painted with yellow marks. For warning purposes, they are marked with "gas pipeline, gas telephone, pipeline pile number, pipeline direction and electronic Patrol information button", so that the patrol and emergency repair personnel can quickly find the pipeline position and win the emergency repair opportunity.
根據(jù)《城鎮(zhèn)燃?xì)夤芾項(xiàng)l例》第三十六條要求,擅自拆除和移動(dòng)天然氣高壓管線上埋設(shè)的電纜警示樁屬于違法行為。
According to the requirements of Article 36 of the regulations on the administration of urban gas, it is illegal to dismantle and move the cable warning piles buried on the high-pressure natural gas pipelines without authorization.
電纜警示樁施工的“七大”步驟流程:準(zhǔn)備的工作——相關(guān)儀器的檢查和矯正——進(jìn)行測(cè)量放線——固定交樁——規(guī)劃線路——調(diào)整交樁——完工后需要記錄相關(guān)信息。更多相關(guān)注意事項(xiàng)可以來我們網(wǎng)站
http://m.tianyals.cn咨詢!
The "seven major" step flow of cable warning pile construction: preparation work - Inspection and correction of relevant instruments - Measurement and setting out - fixed pile handover - planning route - adjusted pile handover - relevant information needs to be recorded after completion. For more relevant precautions, please visit our website http://m.tianyals.cn consulting service